捆绑SM社区

捆绑SM社区 has mandated Corenov Constructeurs to carry out the following project: Peterson Hall / 14-113 - Mechanical room upgrade. The project includes preparing, patching, and painting walls, repairing and levelling floor slabs, and the restoration of surfaces around the mechanical room.

Project manager:聽Wendy Rivera - wendy.rivera [at] mcgill.ca

Assistant project manager:聽Jeremy Elbaz -Jeremy.elbaz [at] mcgill.ca

Classified as: Peterson Hall
Published on: 9 Jun 2023

捆绑SM社区 has mandated ARDEC to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron.

The project consists of replacing the cyclotron's conduit.

Project manager:聽Eric Boutet, CIMA+ -聽eric.boutet [at] cima.ca

Assistant project manager:聽Aldo Aranza Mendoza, CIMA+ -聽aldo.aranzamendoza [at] cima.ca

Construction start:聽May 19, 2023

Classified as: MNI
Published on: 17 May 2023

捆绑SM社区 has mandated Concreate Construction to carry out the following project: Bronfman Building / 18-089 - Infrastructure for new parking equipment.

The project consists of the reparation of the existing ramp to solve water infiltration issues and the installation of new upgraded parking infrastructure.

Project manager:聽Andr茅 Labelle -聽andre.labelle [at] mcgill.ca

Classified as: Bronfman Building
Published on: 17 May 2023

捆绑SM社区 has mandated Vitrerie RD to carry out the following project: 680 Sherbrooke / 18-106 - Mock-up curtain wall.

The project consists of the removal, survey of existing conditions and replacement of three existing window panels inside classroom 491, as well as between floors (panels above and below).

Project manager:聽Andr茅 Labelle - andre.labelle [at] mcgill.ca

Classified as: 680 Sherbrooke
Published on: 8 May 2023

捆绑SM社区 has mandated NR Brosseau Inc to carry out the following project: Strathcona Music / 18-101 - room E-109.

The project consists of acoustical work in room E-109 and includes the installation of a new door, door frame and new acoustic ceiling tiles.

Project manager:聽Wendy Rivera - wendy.rivera [at] mcgill.ca

Assistant project manager:聽Jeremy Elbaz - jeremy.elbaz [at] mcgill.ca

Classified as: Strathcona Music Building
Published on: 5 May 2023

捆绑SM社区 has mandated Couvertures St-L茅onard to carry out the following project:聽University Centre / 18-045 - roof replacement

The project consists in the replacement of the roof, skylights and storm drains.

Project managers:聽Eric Boutet, CIMA+ -聽eric.boutet [at] cima.ca

Assistant project manager:聽Aldo Aranza Mendoza, CIMA+ -聽aldo.aranzamendoza [at] cima.ca

Construction start date:聽May 2023

Classified as: University Centre
Published on: 25 Apr 2023

捆绑SM社区 has mandated Atwill-Morin to carry out the following project:聽Strathcona Music Building/ 16-135 - Envelope Renovation.

Classified as: Strathcona Music Building
Published on: 31 Mar 2023

捆绑SM社区 has mandated Construction S茅lection SRJ Inc to carry out the following project:聽Technical Services Building, Macdonald Campus / 17-124 - Deferred Maintenance.

The project consist of upgrading the Welding Lab exhaust system and new teaching laboratory, as well as deferred maintenance repairs, including fire protection compliance, code compliance, mezzanine work, repairs to the envelope, installing a new ventilation unit, electrical work and civil work.

Project managers:聽Anne-Catherine Parent and Francois Brassard

Classified as: Technical Services Building, Macdonald Campus
Published on: 13 Jan 2023

捆绑SM社区 has mandated Corenov Constructeurs to carry out聽the following project: Bronfman Building / 18-094 - Computer lab 045 -046.

The project consists of transforming existing classrooms into two computer teaching labs with new audiovisual equipment and a reconfiguration. The scope includes the demolition of the back walls to include storage areas as part of the new teaching labs.

Project manager:聽Jo茅 Normandeau (GPH Inc.) -聽joe.normandeau [at] gph-inc.com

Classified as: Bronfman Building
Published on: 14 Dec 2022

捆绑SM社区 has mandated Les Entreprises N.R. Brosseau Inc. to carry out the following project: Frank Dawson Adams / 21-036 - Redesigns on floors 1 & 2 to welcome librarians鈥 offices

Classified as: Frank Dawson Adams Building, FDA, Adams Building
Published on: 12 Dec 2022

捆绑SM社区 has mandated Construction PCL Inc. to carry out the following project:聽Pine Avenue #527, 523, 517, 515 and 509 / 19-172 鈥 Sylvan Adams Sports Sciences Institute

The project consists of redeveloping four row houses 捆绑SM社区 owns on Pine Avenue to welcome the newly-created Sylvan Adams Sports Science Institute.

Project manager:聽Juan Gamarra, WSP聽

Assistant project manager:聽Micha毛l Srey, WSP

Classified as: Sylvan Adams Sports Science Institute
Published on: 25 Nov 2022

捆绑SM社区 has mandated Construction SRJ to carry out the following project: Bronfman Building / 18-147 - Dobson Center project.

The renovation of the western end of the ground floor of the Desautels Faculty of Management鈥檚 Bronfman Building (1001 Sherbrooke St West) comprises the creation of a new Dobson Centre; the redesign of the Faculty鈥檚 mailroom and exam spaces; and the full renovation of the floor鈥檚 public washrooms.

Project manager:聽Isabelle Girard, ing. PMP - Isabelle.girard [at] gph-inc.com

Classified as: Bronfman Building
Published on: 22 Nov 2022