À¦°óSMÉçÇø

News

Study areas on main floor of Redpath Library Building closed until late July

Published: 26 June 2014

Renovations are currently taking place in the Redpath Library Building, making parts of the main floor temporarily inaccessible.

Study areas and group study rooms on the main floor of the Redpath Library Building are closed.

The e-classroom (Room RM-23), Cybertheque (basement level) and Blackader area (2nd floor) will remain open and are accessible via alternate routes.

The Writing Centre can be accessed via the Redpath Hall entrance on the side terrace.

The work is expected to be completed in late July.

We apologize for any inconvenience this might cause.

Questions? Ask us!ÌýÌýChatÌý• EmailÌý• TextÌý• Call ÌýÌýÌýÌýÌýÌýÌýÌýÌýÌý ³§±ð²Ô»åÌý´Ú±ð±ð»å²ú²¹³¦°ìÌýÌýÌýÌý¸é±ð±è´Ç°ù³ÙÌý²¹Ìý±è°ù´Ç²ú±ô±ð³¾

Back to top